Bathroom Renovations
From cosmetic updates to full gut-and-rebuilds. Proper waterproofing, clean tile work, and fixtures installed to last — not just to look good on day one.
“We've used other contractors before and always had something go sideways. This was different. Clear quote, showed up on time, finished on budget. The bathroom turned out better than we imagined.”
Renee & David K.
Allen, TX · Master Bath + Flooring
What's Included
Most bathroom failures trace back to shortcuts in waterproofing or substrate prep. We don't take those shortcuts — because we're the ones who fix them when they fail.
Every wet area gets proper membrane waterproofing before tile goes up. This is the step that determines whether a bathroom lasts 5 years or 25.
Layout planned before the first tile is set. Grout lines consistent. Cuts clean. No lippage. We treat tile work as a craft, not a production task.
We coordinate plumbing rough-in and fixture installation in the correct sequence. No tile installed before the plumber signs off on rough-in.
Bathroom projects have a lot of sequencing dependencies. We build that into the schedule — not around it.
The Process
We inspect existing conditions — waterproofing, subfloor, plumbing rough-in — before quoting. Hidden issues get identified before they become change orders.
Clear line items. Material selections confirmed before work begins. No surprises when the tile arrives.
We demo to the studs, inspect the substrate, and install proper waterproofing before any tile or finish work begins. This is where corners get cut by other contractors — we don't cut them.
Tile, fixtures, vanity, and trim installed in the correct sequence. We don't rush phases to hit an arbitrary deadline.
We walk the completed bathroom with you. Grout lines, caulk joints, fixture alignment — everything is reviewed before we close the job.
Common Questions
A standard bathroom remodel — tile, vanity, fixtures, and paint — runs 1–3 weeks. Full gut-and-rebuilds with plumbing relocation run 3–5 weeks. We set a realistic schedule in the quote and communicate any changes proactively.
Yes, and we treat it as a non-negotiable step — not an upsell. Proper waterproofing behind tile in wet areas is what separates a remodel that lasts from one that fails in 3–5 years. We use industry-standard membrane systems.
Yes. Tub-to-shower conversions are one of the most common bathroom projects we handle. We manage the plumbing rough-in changes, waterproofing, and full tile installation.
Plumbing and electrical modifications require permits in most municipalities. We identify permit requirements during scope review and manage the process. Permit costs are included in the quote.